Metal Roofing Alliance Member
TVA Preferred Partners Network
10,000+ Metal Roof Jobs
Nashville, TN
Licensed & Insured
BBB A+
  • bullet icon
Free Quote Review · Nashville & Middle Tennessee

Get a Second Opinion on Your Roofing Quote | Free, Line by Line, From a Metal-Only Contractor

Holding a quote from another roofing company? Send it to us. We read it line by line, compare it against field data from more than 10,000 metal roof jobs across Middle Tennessee, and tell you in plain English what is in it, what is missing, and whether the price is fair. No charge, no obligation, and no sales pitch disguised as a review.

We are a metal-only contractor, so we review asphalt shingle quotes with no reason to steer you either way. Bring quotes for metal, asphalt, repairs, replacements, or coatings. If the quote in your hand is fair, we will say so, and you can sign it with confidence.

Last Updated · August 2026 · Nashville, TN
  • Free

    No Charge, No Obligation

  • 10

    Parts in a Complete Quote

  • 8

    Red Flags We Check For

  • 10,000+

    Jobs Behind Every Review

Section I

Why Get a Second Opinion?

Nashville metal roof pricing and budgeting

A roofing quote is a plan for the single most expensive repair most buildings ever need, and no two contractors write one the same way. One quote names the gauge, the finish, the underlayment, and the decking terms. Another fits on half a page and hopes you compare bottom lines. Our second opinion exists to close that gap: we put your quote next to our field data from 10,000+ Middle Tennessee metal roof jobs and translate it into plain English.

What you get back is specific: what the quote covers, what it leaves out, whether each line is priced inside Middle Tennessee's real ranges, and the questions to ask before you sign. The differences that matter are rarely in the bottom line. They live in the decking clauses, the flashing detail, and the warranty terms that only surface after the deposit clears.

Free
No Charge Ever
1 Day
Usual Turnaround
10,000+
Jobs Behind the Benchmarks
$0
Obligation to Use Us

A note on how we handle it: the review is a reading service, not a sales call. We do not contact the other contractor, we do not ask who they are, and we do not need their name to grade the paperwork. You get our read in writing, you keep both documents, and whatever you decide, you decide it informed.

Section II

The Anatomy of a Complete Roofing Quote

There are ten places a roofing quote can hide a problem, and four groups that account for nearly every dispute we hear about: scope, materials, flashing, and warranty. Check your quote against each group below. Where the paper goes quiet is where the change orders live.

Comparing metal roofing systems for Tennessee homes

The Four Groups That Decide a Quote

Every line item on a roofing quote belongs to one of four groups: what comes off and what gets fixed underneath, what goes on and exactly which product it is, how the edges and penetrations are detailed, and what promises survive after the crew leaves. Read your quote once for each group and you will know more about it than most buyers ever learn.

10
Parts of a Complete Quote
4
Groups They Fall Into
2
Warranties Every Quote Needs
1
Question: Where Is It Vague?

Group by Group

1

Scope, Tear-Off & Decking

The quote should state how many layers come off, who hauls the debris, and the per-sheet price for replacing bad decking found under the old roof. Decking is invisible until tear-off, so a fair quote prices the surprise before it happens. Silence here is the number one source of change orders in Middle Tennessee.

2

Materials, Named in Writing

Panel profile, steel gauge (26 gauge standard, 24 gauge upgrade for standing seam), paint system (PVDF, also called Kynar, versus SMP), underlayment type, and the fastening system, concealed clips or exposed screws. Two quotes can both say metal roof and describe products a decade apart in service life. If it is not named, it is not promised.

3

Flashing, Penetrations & Airflow

Valleys, chimneys, sidewalls, pipe boots, drip edge, ridge, and ventilation. Roofs leak at transitions, not in the middle of a panel, and this is where cheap quotes quietly cut. Look for custom fabricated or brake formed flashing, and confirm the permit: in Metro Nashville, work beyond 33 percent of the roof area moves past normal maintenance.

4

Warranty & Payment Terms

Two warranties, in years, in writing: the manufacturer's material warranty and the installer's workmanship warranty. Then the money mechanics: deposit size, draw schedule, and how change orders get approved. A lifetime warranty that never mentions workmanship covers the metal, not the mistakes.

Section III

A Sample Quote, Read Line by Line

This is the walkthrough we run on every quote that comes in. Ten lines, in the order they usually appear on the paper. For each one: what a complete quote says, and the version that should make you slow down.

1. Tear-off and disposal

Should say: how many layers come off, who hauls the debris, and that dump fees are included. Slow down when: the line just says remove roof, with no layer count and no disposal terms.

2. Decking terms

Should say: a per-sheet price for replacing bad decking, inspected at tear-off. Slow down when: there is no decking line anywhere on the page. That silence is the most expensive sentence never written.

3. Underlayment

Should say: a named, high temperature synthetic underlayment. Slow down when: it says felt paper, or nothing at all, under a metal roof in a Tennessee summer.

4. The metal itself

Should say: panel profile, steel gauge (26 gauge standard, 24 gauge upgrade for standing seam), and the paint system by name, PVDF (Kynar) or SMP. Slow down when: it says metal panels with no gauge and no finish. Those two words hide a decade of service life difference.

5. Fastening system

Should say: concealed clip standing seam or exposed fastener, stated plainly, because they carry different maintenance lives. Slow down when: the phrase metal roof is doing all of the work.

6. Flashing and trim

Should say: valleys, chimney, sidewalls, drip edge, ridge, and pipe boots, custom fabricated or brake formed. Slow down when: flashing is priced as needed. Roofs leak at transitions, and as needed means argued about later.

7. Ventilation

Should say: how ridge and intake airflow is preserved or improved. Slow down when: ventilation is not mentioned at all on a full replacement.

8. Permit

Should say: who pulls the permit and who pays the fee. In Metro Nashville, work beyond 33 percent of the roof area moves past normal maintenance. Slow down when: a full replacement quote never mentions the word.

9. The warranty, split in two

Should say: material warranty years from the manufacturer and workmanship warranty years from the installer, separately, plus whether workmanship transfers when you sell. Slow down when: it says lifetime warranty with no split. That version covers the metal, not the mistakes.

10. The money

Should say: the total, the per-square math behind it, deposit size, a draw schedule tied to milestones, and a written change-order process. Slow down when: there is one round number and a large deposit due at signing.

Score your quote against these ten. Seven or more complete lines is a serious document worth negotiating from. Four or fewer is not a quote, it is an estimate wearing a quote's clothes, and you should ask for the real one.

Section IV

Red Flags We See Every Week

A red flag is not proof a contractor is dishonest. It is a place where the paperwork stops protecting you. Any single one deserves a question; two or more deserve a second opinion before anything gets signed. These are the eight we see most often across Middle Tennessee quotes, grouped into the four patterns they follow.

The Eight That Matter Most

Pricing Games

A today-only discount, and a price per square far below the market. Real prices survive a night of sleep, and money missing from a lowball comes back later as change orders or missing flashing. Check any number against the published benchmarks further down this page before treating it as a deal.

Missing Specifications

No gauge, no finish, no product names, no underlayment type. You cannot compare what is not written down, and vague paper always resolves in the contractor's favor. If the metal is not named, the quote is a placeholder, not a commitment.

Paperwork Gaps

No Tennessee contractor license number, no proof of insurance, no written workmanship warranty, no decking clause, and a large deposit due before materials are ordered. Verify any license, including ours, number 75515, with the state licensing board. Legitimate contractors put credentials on the paper because they want you to check.

Pressure Tactics

Door-to-door storm quotes from out-of-state crews, urgency to sign before an insurance adjuster has seen the roof, and discounts that expire when the salesperson leaves the driveway. Some storm-response companies are legitimate. The paperwork, not the pitch, tells you which.

Section V

When the Quote Comes From a Storm

Storm claims change the paperwork. You are now reading two documents, the insurer's scope and the contractor's quote, and they rarely match line for line. Most replacement cost policies pay in two steps: actual cash value up front, then the recoverable depreciation after the work is completed and documented. The insurer's scope lists what they agreed to pay for. The contractor's quote lists what the roof needs. When the two disagree, the gap gets handled through a documented supplement with photos and measurements, not a handshake.

Get the roof documented independently first. A written inspection with photos gives you and the adjuster the same set of facts before anyone negotiates. Read for cosmetic exclusions if you own a metal roof. Some Tennessee policies exclude dent-only damage, and the cosmetic versus functional call is exactly what an inspection settles. Treat doorstep contingency agreements as what they are: contracts. Some are legitimate scheduling tools after a storm; all of them deserve a careful read before a signature. Match scope to quote line by line before work starts, and keep every photo, report, and invoice in the claim file.

The full claims walkthrough lives on our insurance page. Storm-damaged quotes get the same free read as everything else: send the scope and the quote together, and we will read them side by side.

A Worked Claim Example

Here is how the money actually moves on a replacement cost policy. Say the insurer approves a $30,000 roof with a $1,000 deductible, and $12,000 of the approved value is held as recoverable depreciation. The first check arrives at $17,000: the approved amount minus the held depreciation, minus your deductible. The remaining $12,000 is released after the completed work is documented, which is why finishing the paperwork is part of finishing the roof. The deductible is yours in every scenario. Treat anyone offering to make it disappear as a red flag with a ladder.

Now line the contractor's quote against that scope. A $33,000 quote against a $30,000 scope needs a documented supplement for the gap: photos, measurements, and the items the estimate missed. A $24,000 quote against the same scope needs a different question: what got left out? Scope and quote describing the same roof should converge as the paperwork improves. When they will not converge, that is the moment to send us both documents.

Section VI

The Benchmarks and How to Compare

Two quotes are almost never for the same roof, so comparing bottom lines tells you nothing. Normalize both to the square: one square is 100 square feet of roof surface, and dividing each total by your roof size shows what every contractor charges per unit of roof. Then compare spec to spec, gauge against gauge and finish against finish. Finally, price the missing lines: if a quote skips decking terms or flashing detail, add a realistic allowance before comparing, because silence is not savings. Our current published ranges are below.

40–51%
Coating vs Replacement Cost
$800–$1,900
Per Square Installed, By System
$150–$1,000
Repair Range, Median Near $500
$0
Cost of a Second Opinion

What Moves a Quote Up or Down

Factor
Impact on Cost
Factor
Roof Size (sq ft)
Impact on Cost
Larger roofs price lower per square; small jobs carry mobilization cost either way
Factor
Roof Condition
Impact on Cost
Decking repairs, rust, and old layers add real, nameable line items
Factor
Access & Complexity
Impact on Cost
Steep pitch, multiple stories, and cut-up rooflines add labor per square
Factor
Number of Penetrations
Impact on Cost
Every chimney, pipe, and skylight needs flashing detail worth paying for
Factor
Material Grade
Impact on Cost
26 vs 24 gauge and PVDF vs SMP move price and service life together
Factor
Warranty Terms
Impact on Cost
Longer written workmanship coverage reflects a contractor priced to stand behind the roof
Factor
Season & Schedule
Impact on Cost
Booking the off season buys schedule position, never lower build quality

A Worked Example

Take a 20 square roof, 2,000 square feet. At our published ranges that is $16,000 to $19,000 in classic panel, $17,000 to $30,000 in metal shingles, and $22,000 to $38,000 in standing seam, before any decking surprises, which is exactly why the decking clause matters. A quote of $12,000 for standing seam on that roof is not a bargain. It is a different roof than the one you think you are buying.

The same logic runs the other way. A quote far above the ranges should point to something you can see on the paper: copper or zinc, a complex roof, difficult access, premium warranty terms. Explained is fine. Unexplained is a question, and questions are what the free second opinion is for. Call (615) 649-5002 and read it to us.

The Side-by-Side Worksheet

Print your quotes and fill one line per spec: gauge, finish, underlayment, decking terms, flashing detail, ventilation, permit, material warranty years, workmanship warranty years, deposit size, and price per square. The quote that fills every line without a phone call is the quote that respects you. Any line you cannot fill from the paper is your next question for that contractor.

Ten Questions That Sort Every Bidder

1. What gauge and finish is the metal, exactly as it will appear on my invoice? 2. What happens if you find bad decking, and what is the per-sheet price? 3. Who pulls the permit? 4. Is the flashing custom fabricated or stock? 5. What underlayment goes under the panels?

6. How is the roof ventilated after the work? 7. How many years is the workmanship warranty, in writing? 8. Does the warranty transfer if I sell the house? 9. What milestones is the payment schedule tied to? 10. Who is actually on my roof, your crew or a subcontractor?

triangle icon
Section VII

The Roof Math Behind Every Quote

Roofing prices live in squares: one square is 100 square feet of roof surface. Your roof is bigger than your house because it is tilted, so you cannot take a footprint from the tax record and divide. Geometry does the correction. Multiply the building footprint, including overhangs, by the factor for your roof pitch, and you have a working estimate of true roof area. Pitch is written as rise over run: a 6/12 roof rises six inches for every horizontal foot.

Roof pitch
Multiply the footprint by
4/12 pitch
1.054
5/12 pitch
1.083
6/12 pitch
1.118
7/12 pitch
1.158
8/12 pitch
1.202
9/12 pitch
1.250
10/12 pitch
1.302
12/12 pitch
1.414

Two Worked Examples

A 1,800 square foot footprint under a common 6/12 roof: 1,800 times 1.118 is about 2,012 square feet, call it 20 squares. A 2,400 square foot footprint under a steeper 8/12 roof: 2,400 times 1.202 is about 2,885 square feet, call it 29 squares. At standing seam pricing of $1,100 to $1,900 per square, that second roof should quote somewhere between $31,900 and $55,100 installed. When a quote lands far outside the bracket the math builds, the quote owes you an explanation on paper.

Why Two Quotes Count Different Squares

Two honest contractors can still list different square counts. Material squares include a waste factor, usually 10 to 15 percent for cuts, ridges, hips, and valleys, while measured squares describe the roof surface itself, and complex rooflines carry more waste. When you compare quotes, divide each total by that quote's own square count so the waste assumptions cancel out. Then ask any bidder whose count differs from the others by more than a square or two to show the measurement. Aerial measurement reports make that a two minute conversation.

Section VIII

Three Quotes, Side by Side

Here is the comparison we walk homeowners through most often, a composite built from quotes we review every week: one roof, about 20 squares, three bids that look impossible to compare. Watch what happens when each total is divided by the same 20 squares and read against the benchmarks above.

$890
Per Square, Quote A
$1,170
Per Square, Quote B
$1,540
Per Square, Quote C
20
Squares, Same Roof

Quote A: $17,800, one page

The line reads metal roof, installed. No gauge, no panel name, no underlayment, no decking clause, and half the money due at signing. The math says $890 per square, inside the $800 to $950 exposed fastener range, so the price itself is plausible. The paper is the problem. If the specs get written down and the deposit gets tied to a materials order, this can become a real bid. As it stands, you would be signing a placeholder.

Quote B: $23,400, exposed fastener

This one names the panel: 29 gauge exposed fastener steel with synthetic underlayment, new drip edge, and a ten year workmanship warranty. Specified, but the math says $1,170 per square, well above the $800 to $950 exposed fastener range and already past the $1,100 floor where standing seam pricing begins. Nothing in the spec explains the premium. This is the quote that owes you an answer, because at this money you could be shopping concealed fastener systems.

Quote C: $30,800, standing seam

The longest quote and the highest number: 26 gauge standing seam with a PVDF finish, high temperature ice and water shield, custom fabricated flashings, permit included, lifetime workmanship warranty in writing. The math says $1,540 per square, inside the $1,100 to $1,900 standing seam range. Quote C is not $13,000 more expensive than Quote A. It is a different product with a different service life, priced fairly for what it is.

The quote
What the math says
Quote A, $17,800
$890 per square. Fair price, empty paper. Fix the specs or walk.
Quote B, $23,400
$1,170 per square. Exposed fastener at standing seam money. Needs an answer.
Quote C, $30,800
$1,540 per square. Complete, specified, and priced inside its range.

The lesson generalizes: sticker prices compare nothing. Only specified quotes can be compared, and the spread between honest, specified bids for the same build is usually far smaller than the spread on the stickers. This is exactly the reading we do when you send yours in.

Section IX

The Fine Print: What You Sign Is What You Get

Everything before this section was about the roof. This section is about the agreement, because the quote you sign is usually the contract itself, and the boring paragraphs are the ones that decide what happens when something goes sideways.

1 Min
To Verify a TN License
2
Coverages on the Certificate
33%
Metro's Maintenance Threshold
0
Verbal Change Orders to Accept

License and Insurance, Verified

A Tennessee contractor working at replacement scale should carry a state license you can verify with the licensing board in about a minute; ours is number 75515, and we want you to look it up. Then ask for a certificate of insurance sent directly from the contractor's insurance agent, showing both general liability and workers compensation. Roofing is exactly the trade where an uninsured injury on your property becomes your problem.

Deposits and Draw Schedules

A reasonable deposit reserves your slot and starts the material order, and the paper should say so: the deposit amount, what it purchases, and a payment schedule tied to milestones you can see, such as material delivery, dry-in, and final walkthrough. Final payment waits for the walkthrough. Be careful with any schedule that puts most of the money in hand before most of the work is on the roof.

Change Orders and Or Equivalent Clauses

Decking surprises are normal; surprise pricing is not. The quote should carry a per sheet price for decking replacement before anyone climbs a ladder, and every change order should be written and priced before the work it describes happens. Watch for or equivalent language on materials. It gives the installer room to substitute, so either strike it or define what counts as equivalent in gauge, finish, and warranty.

Lien Waivers and Close-Out

In exchange for final payment, ask for a lien waiver covering the contractor and any suppliers, plus the close-out packet: permit sign-off where one was required, warranty documents in writing, and the photo record of what is under your panels. Metro Nashville treats roof repairs up to 33 percent of roof area as normal maintenance, but a full replacement is permitted work, and the sign-off belongs in your file.

Section X

The Warranty Decoder: Two Promises, Read Separately

Every roofing quote carries two different promises that homeowners are encouraged to read as one. The manufacturer warrants the material. The installer warrants the work. They fail differently, they transfer differently, and only one of them covers the way roofs actually leak.

2
Warranties in Every Quote
Lifetime
Our Workmanship Warranty
10-20+
Years on Silicone Systems
25 Mil
Minimum Dry Film Spec

The Material Warranty

Metal finish warranties are long because PVDF paint systems earn it, commonly decades against fade and chalk, with separate coverage against substrate perforation. Read for three things: whether the warranty is prorated, meaning the payout shrinks every year; whether it requires registration or an approved installer to be valid at all; and whether the paint warranty and the metal warranty are the same document, because they are not. A quote that says lifetime warranty without naming whose lifetime, of what, has told you nothing yet.

The Workmanship Warranty

Field data from more than 10,000 Middle Tennessee repairs says roofs rarely fail in the middle of a panel. They fail at pipe boots, flashings, and fasteners, which is to say they fail at workmanship. That is why the installer's warranty is the one that matters most, and the one to get in years, in writing. Ours is lifetime, on every installation. Ask two questions of any bidder: how many years, and does it transfer when I sell the house.

What Voids Them

The fastest ways to void a roof warranty have nothing to do with the roofer: a satellite dish screwed through a panel, a solar array fastened to the deck instead of clamped to the seams, another trade walking the wrong line on a low slope roof. On standing seam, solar must clamp to the raised seam and never penetrate the panel. Route every future penetration through the installing contractor and both warranties survive.

Coating Warranties

Restoration coatings carry their own manufacturer warranties, commonly 10 to 20 or more years for silicone systems applied at proper thickness; our minimum spec is 25 mils of dry film. The practical magic is renewability: at the end of the term the roof can be cleaned and recoated instead of torn off. A coating quote without a named chemistry, a thickness spec, and a warranty term is not yet a quote.

Section XI

Repair, Coat, or Replace: The Question Under Every Quote

Before you compare replacement quotes, make sure the roof actually needs one. Across our books we perform about ten metal roof repairs for every full replacement, and the arithmetic is lopsided: repairs run $150 to $1,000 with a typical invoice near $500, while 2026 replacement projects ran $15,000 to $69,600. A quote that says replace should be able to name the failure that makes a $500 fix impossible.

10:1
Repairs to Replacements
$500
Typical Repair Invoice
40-51%
Coating vs Replacement Cost
50-70
Standing Seam Service Years

When a Repair Wins

Most metal roof problems are detail problems: failed pipe boots, flashing that has pulled loose, fasteners backing out, isolated storm damage. None of those are the panels. If the leak traces to a detail and the panels and decking are sound, a repair is not a compromise, it is the correct engineering answer, and it buys the roof years.

When a Coating Wins

On commercial roofs, restoration is the option most owners are never quoted. Where the same roof was bid both ways, a coating restoration typically ran 40 to 51 percent of the replacement price. The condition is honesty about the substrate: tight seams, dry decking, sound metal or membrane. We put a minimum of 25 mils of coating on roofs that qualify, and we tell you plainly when a roof does not.

When Replacement Is the Honest Answer

Replacement is honest when the failure is systemic: saturated insulation or decking, widespread corrosion, a roof at the end of its service life. Age is evidence, not proof. Asphalt shingles in Middle Tennessee run 20 to 25 years, exposed fastener metal 25 to 45, metal shingles 40 to 60, standing seam 50 to 70. A quote to replace a 15 year old standing seam roof deserves hard questions. A quote to replace 22 year old asphalt usually does not.

Section XII

From Signature to Finished Roof

A quote is also a schedule, and knowing the real sequence tells you which dates in a bid are honest. From first visit to finished roof, a typical project runs up to about three weeks, and most of it is invisible from the driveway.

6
Stages in Every Project
3 Weeks
Or Less, Signature to Finished
Same Day
Opened Sections Dried In
1
Foreman Walkthrough at the End

1. Assessment, day one

Measure, photograph, check decking and ventilation from the attic side where access allows, and talk through system options at the roof, not the kitchen table. This visit is free and produces the numbers everything else is built on.

2. Design and the written estimate

Profile, gauge, and color locked in with physical PVDF samples in your hand, then the line item estimate this page just taught you to read.

3. Permits and approvals

Davidson and Williamson County permits and HOA submittal packets where they apply. Metro Nashville treats repairs up to 33 percent of roof area as normal maintenance; a full replacement is permitted work, and the permit line belongs in the quote.

4. Fabrication

Panels cut to your exact run lengths and flashings bent to spec at the Nashville yard. This is the quiet week that makes the installation fast, and it is why a metal quote can promise less time on your roof than an asphalt one.

5. Installation

Tear-off in sections, full deck inspection, high temperature underlayment, then panels and custom flashings. Opened sections are dried in the same day, weather permitting, and every evening ends with a magnet sweep of the yard for fasteners.

6. Walkthrough and warranty

A foreman walkthrough with you, photo documentation of what now lives under the panels, permit close-out, and the lifetime workmanship warranty delivered in writing. That packet is the close-out file Section IX told you to collect.

Section XIII

The Language of a Roofing Quote

Quotes are written in trade shorthand. Here is the shorthand, translated. Skim it once and the rest of your quote starts reading in plain English.

Measurement

Square: 100 square feet of roof surface, the unit all roof pricing uses. Pitch: slope written as rise over run, so a 6/12 roof rises six inches per horizontal foot. Pitch factor: the multiplier that converts a footprint to true roof area, tabled in Section VII. Waste factor: the extra material, usually 10 to 15 percent, consumed by cuts, ridges, hips, and valleys. Run length: the eave to ridge distance a standing seam panel must span in one piece.

Materials and Systems

Gauge: steel thickness, and smaller is thicker: 24 gauge outranks 26, which outranks 29. PVDF, sold as Kynar: the premium architectural paint system, the finish that keeps its color for decades. SMP: the economical paint system, sound on barns and shops, with a shorter fade life in full sun. Standing seam: panels joined at raised seams over concealed clips, with no fastener heads exposed to weather. Exposed fastener panel: ribbed panels screwed through the face, the economical system, also sold as classic panel or corrugated. Metal shingles: stamped steel or aluminum profiles that read as slate, shake, or tile from the street. Underlayment: the water barrier between deck and metal; on a metal roof, specify high temperature rated. Ice and water shield: the self adhering membrane at eaves, valleys, and penetrations, the last line of defense under the metal.

Details and Workmanship

Decking, or sheathing: the wood surface everything else depends on; the quote needs a per sheet price for replacing the bad ones. Flashing: the formed metal wherever the roof meets anything else: chimneys, sidewalls, valleys. Custom fabricated beats stock bends. Pipe boot: the seal around plumbing vents, and the single most common repair we perform. Drip edge: the perimeter metal that throws water clear of the fascia. Ridge vent: exhaust ventilation at the peak; intake at the eaves has to match it or the attic cooks. Oil canning: cosmetic waviness in the flat of a panel, managed with striations and proper gauge, not a leak risk. Fastener backout: screws working loose over years of thermal movement, the routine maintenance item on exposed fastener roofs.

Money and Paperwork

Scope of work: the list of everything the price includes; the shorter it is, the more you will buy later. Exclusion: anything the quote names as not included. Read these twice. Allowance: a placeholder dollar amount for an unpriced item, which means the real number arrives later. Change order: a written, priced amendment for work discovered mid job. Supplement: on insurance claims, the documented request that adds missed items to the carrier's scope. ACV and RCV: actual cash value pays depreciated value up front; replacement cost value policies release the held depreciation after the work is completed and documented. Lien waiver: the document confirming the contractor and suppliers are paid, collected at final payment. Workmanship warranty: the installer's own promise, in years, in writing, covering the labor and details where roofs actually leak.

Claims and Commercial

Scope of loss: the insurer's line item estimate of covered damage, the document a contractor's quote gets reconciled against. Recoverable depreciation: the held back portion of a replacement cost claim, released after completed work is documented. Deductible: your share of the claim, owed in every scenario; be wary of anyone offering to make it disappear. Contingency agreement: a doorstep document authorizing a contractor to pursue your claim; read it as the contract it is. Mobilization: a commercial line item covering crew, equipment, and staging setup. Recover: installing a new roof over the existing one where codes and conditions allow, avoiding tear-off. Dry film thickness: the measured mils of cured coating on a restoration; our spec starts at 25. Punch list: the closing checklist of small items between substantially done and actually done. Kick-out flashing: the small diverter where a roof edge meets a wall, famous for being skipped and causing hidden rot. Snow retention: rails or clamps that keep smooth metal from shedding snow in sheets above doorways and walkways.

Section XIV

Metal vs Asphalt: The 50 Year Ledger

Asphalt quotes win the mailbox because the sticker is smaller, and if your ownership window is short, that can be the rational choice. The study grade comparison uses a longer window. A published 50 year comparison for a 2,000 square foot home estimates roughly $10,000 at installation for architectural shingles, $16,000 for metal shingles, and $22,000 for standing seam. Those numbers only make sense next to service life, because Tennessee heat cycles retire asphalt on a schedule metal does not keep.

2-3
Asphalt Roofs in a 50 Year Window
1
Metal Roof in the Same Window
20-25
Asphalt Years in Tennessee
50-70
Standing Seam Years
The system
The 50 year picture
Architectural shingles
About $10,000 to install. Tennessee service life of 20 to 25 years means a 50 year window buys two to three roofs, each with its own tear-off and disposal.
Metal shingles
About $16,000 to install. Service life of 40 to 60 years: one roof usually covers the whole window.
Standing seam
About $22,000 to install. Service life of 50 to 70 years: one roof, one install, solar ready with no penetrations.

We are a metal-only contractor and we say so on every page, so weigh the source. But the arithmetic is not ours: by year 50 an asphalt home has bought two or three roofs, each with its own tear-off, disposal, and decade of price inflation, while one standing seam install spans the whole window. The cheapest roof per year of service is rarely the cheapest roof at install. When a metal quote and an asphalt quote are competing for the same house, divide each by the years it will actually serve and read them again.

Section XV

How the Free Review Actually Works

Everything above is the curriculum. This is the service. Send the quote and it goes through the same five passes, in the same order, every time. Call or text (615) 649-5002, open every day 8am to 8pm, or use the Send Your Quote button at the bottom of this page.

10
Parts Checked Line by Line
8
Red Flag Patterns Screened
1 Day
Usual Turnaround
$0
Cost, Obligation, or Pressure

1. Send the paperwork

A photo or PDF of the quote and your city; roof size if you know it. On a storm claim, send the insurer's scope with it so both documents get read together.

2. The completeness pass

The quote is checked against the ten parts of Section II. Every part that is missing or vague becomes a written question you can hand the bidder.

3. The price pass

Total divided by squares, read against the Section VI benchmarks built from more than 10,000 Middle Tennessee jobs. Inside the range, outside it, or unexplainable: you get the number either way.

4. The terms pass

Warranties in years, deposit and draw schedule, decking price, change order language, license and insurance. The quiet paragraphs from Sections IX and X, read so you do not have to learn them the expensive way.

5. The verdict, in writing

What is fair, what is missing, and the exact questions to ask, usually the same business day. We never contact the other contractor, we do not ask who they are, and the review costs nothing whether or not we ever meet your roof.

Frequently Asked Questions

Frequently Asked Questions

Is the second opinion really free?

plus icon

Yes. You send the quote, we read it, and we tell you what we see. There is no charge and no obligation. If the quote in your hand is fair, we will say so.

Will you criticize the other contractor?

plus icon

No. We grade the paperwork, not the company. Our review covers scope, materials, and price against Middle Tennessee benchmarks. What you do with it is up to you.

Do you review asphalt shingle quotes?

plus icon

Yes. We are a metal-only contractor and do not install asphalt shingles, so we have no reason to steer you either way on an asphalt bid. If asphalt is the right call for your budget and plans, we will tell you.

What do I need to send?

plus icon

A photo or PDF of the quote and your city. Roof size helps if you know it. Call (615) 649-5002 or use the contact page, and we will usually get you an answer the same business day.

More Quote Questions

Asked Every Week, Answered Straight

Is my roofing quote too high?

Divide the total by your roof size in squares and compare against the published ranges on this page: $800 to $950 for exposed fastener, $850 to $1,500 for metal shingles, $1,100 to $1,900 for standing seam. Inside the range, the question is what the quote includes. Far outside it, in either direction, the quote should explain itself on paper. Send it over and we will run that math with you.

How long is a roofing quote good for?

Most quotes state a validity window, commonly 15 to 30 days, because material prices move. A quote with no expiration date is not a red flag by itself, but confirm the price is still current before signing anything older than a month. A contractor who honors a written price without drama is telling you something good.

Should I get three quotes?

Two or three comparable quotes beat five vague ones. The goal is not volume, it is comparison: same roof, same specs, prices you can put side by side. Once quotes are specified to the same build, the honest spread in this market is usually much smaller than the sticker spread suggests.

Will you just try to sell me a metal roof?

No. If the quote you are holding is for asphalt and asphalt fits your budget and your plans for the house, we will say so. We install metal exclusively, which means an asphalt recommendation costs us nothing and earns your trust. The review is the product; whether you ever hire us is up to you.

What is a supplement on an insurance claim?

A supplement is a documented request asking the insurer to cover items the original scope missed, backed by photos and measurements. Supplements are a normal part of storm claims, not a trick. The contractor submits the evidence, the adjuster reviews it, and the approved amount is added to the claim. Keep every document; the file you hold is your protection.

Can I pick my own contractor on an insurance claim?

Yes. You choose the contractor. The insurance company owes the covered scope of work; it does not choose who performs it, and preferred vendor lists are optional programs, not requirements. Pick the contractor whose paperwork holds up, then have the scope and the quote reconciled line by line.

Is a big deposit ever normal?

Sometimes. Custom fabricated and specialty metals, copper and zinc especially, can carry a real material deposit because the metal is ordered for your roof alone. The tell is the paper: a legitimate deposit is tied to a written materials order with named products. A large deposit with no materials list attached is the pattern to walk away from.

Do you review commercial roofing quotes?

Yes, including coating and restoration bids. Commercial coating quotes we have reviewed run $2.50 to $6.85 per square foot, with most landing between $3.30 and $4.50. If a bid proposes full replacement, we check whether a coating at 40 to 51 percent of that cost would do the job, and whether the roof is actually sound enough to coat. The same free read applies either way.

Who Reads Your Quote

Reviewed by People Who Build Roofs

Every second opinion is read by The Metal Roofers field team in Nashville: a family-owned, metal-only contractor since 2003 with more than 10,000 metal roof jobs and 1,000+ full replacements across Middle Tennessee, rated 4.9 stars across 150+ Google reviews. We hold Tennessee Contractor License #75515, verifiable with the state licensing board, and an A+ rating you can check on our BBB profile along with our Metal Roofing Alliance contractor listing. The benchmarks on this page are the same published numbers we quote from, and they update as our job data does.

✦ Send Your Quote ✦

Ready to Know What Your Quote Is Really Saying?

Text a photo of it, email a PDF, or read it to us over the phone. We will put it against 10,000+ Middle Tennessee jobs and give you the plain-English read: what is solid, what is missing, and what it should roughly cost. No obligation. No pressure. If the quote is fair, we will tell you to take it.

(615) 649-5002

Nashville & Middle Tennessee · Licensed & Insured · BBB A+ Accredited

Related Resources

Before or after your review, the numbers behind it are public: the Nashville metal roof cost guide holds every 2026 price range on this page, metal roof replacement in Nashville covers what a complete install includes, commercial roof coating explains the restoration path that costs 40 to 51% of replacement, and financing options shows how projects actually get paid for. When you are ready, send the quote over.