How a 26-gauge exposed-fastener PBR roof was installed in Readyville

The written scope for this Readyville home specifies 26-gauge Classic exposed-fastener panels and gasketed ZAC screws. The installation reel calls the ribbed roof PBR. Watch where the fasteners go into the panel face, then see the finished roof above the brick and timber entry.

Watch the project reelSee the finished roof ↓
Finished ribbed exposed-fastener roof and dark rake trim over the Readyville timber entry
Finished front gable, 1:04. The angle shows the ribbed panel field above the edge trim and the exposed timber below.

Readyville, TN

Brick and timber entry

26-gauge Classic

Exposed-fastener agreement

Gasketed ZAC

Named in the written scope

Ribbed field

Screw heads visible

01 · The Finished Roof

Look from the panel face to the timber entry

On this brick home, the gabled entry has exposed timber and a deep overhang. Roof lines and trim are visible from the entry, which makes the relationship between the ribs, the gable and the fascia easy to see. The proposal presented both Classic exposed-fastener and concealed-fastener standing seam, and the project agreement selected Classic. The record establishes the option selected, not the homeowner's private reasons for choosing it.

Opposite angle of the finished Readyville timber gable, metal rake trim and adjacent roof planes
Finished view from the other side, 0:57. Follow the rake trim down the timber gable to the adjoining, lower roof plane.
Ridge cap and rows of face fasteners across the finished gray ribbed metal roof in Readyville
Finished ridge and panel field, 1:05. The higher camera angle separates the ridge cap from the visible panel ribs and screw rows; it cannot establish the underlying vent assembly.
Dark metal roof edge above the brick-and-timber entry of the Readyville home
Original footage, 1:01.5. Finished edge trim runs along the timber gable.

At the front of the house, the timber entry gives you a fixed reference for the roof overhang and the gable. The close-ups let you compare this ribbed, face-fastened system with a concealed-fastener roof.

The Short Answer

What this job shows

The signed Readyville agreement selects 26-gauge Classic ribbed panels and gasketed, color-matched ZAC screws. The video labels the roof PBR. The agreement also lists full synthetic underlayment, targeted self-adhering membrane and a continuous ridge vent.

The agreement identifies 26-gauge Classic exposed-fastener panels and gasketed ZAC screws. The reel title calls the roof PBR, while the written description is Classic. This case does not equate every Classic or PBR profile. How we document our work.

02 · The Work, In Order

From the first work to the finished roof

Step 01

Start below the metal

The agreement describes a complete roof scope, not installation over an unchecked surface. It calls for working from the exposed decking, assessing the substrate and handling any damage outside the base scope by written change order. The video does not establish how many decking sheets, if any, needed replacement.

Step 02

Separate full underlayment from targeted membrane

The agreement specifies synthetic underlayment across the deck and self-adhering ice-and-water membrane at selected vulnerable details, not across the entire roof. A blue layer is visible in the footage. A close-up alone does not verify the exact product or whether targeted membrane was installed at every location.

Blue underlayment layer on the Readyville roof before metal panels cover it
Original footage, 0:03.8. A blue layer is visible before the panel installation. The shot does not identify every layer below it.

Step 03

Position the ribbed panels

The footage shows the transition from covered deck to ribbed metal. The ribs give the panel its visible profile; the way neighboring panels meet, and where panel runs end, are separate details from color or gauge. When comparing bids, ask what panel profile is specified and how laps and interruptions are addressed.

Close-up of an exposed screw and ribs on a Readyville metal roof panel
Original footage, 0:16.5. A screw is driven through the visible face of a ribbed panel.

Step 04

Fasten through the panel face

The crew footage shows screws entering the visible face of the metal. The agreement calls for gasketed, color-matched ZAC screws driven straight and seated appropriately. Each exposed attachment is also a weather-sealing detail. A still image demonstrates the attachment type, not fastening torque or inspection compliance.

Installer drives an exposed fastener through a dark metal panel beside blue underlayment
Original footage, 0:40.5. Panel attachment in progress; this photograph does not demonstrate torque or spacing across the roof.

Step 05

Finish the gable and other edges

The agreement lists new drip edge, gable and rake trim, a ridge cap, and flashing where the roof intersects other surfaces or openings. The finished view shows dark edge trim following the timber gable. It does not identify the exact treatments at every concealed edge or penetration.

Close-up of a gasketed screw head beside an overlapping metal sheet during the Readyville installation
During installation, 0:56. The screw head and washer remain visible near the sheet edge; the shot does not establish fastening torque, seal quality or the full attachment schedule.

Step 06

Review ventilation and closeout as separate line items

A continuous ridge vent and final cleanup are included in the agreement. The public video shows the finished roof, but it is not a substitute for a written closeout or warranty document. Ask which components are included before comparing two prices that both say metal roof.

The published video shows the finished ribbed metal roof and the trim along the brick-and-timber entry. The scope and footage establish the system and show how it was installed. They do not establish a measured service life, an exact finish code, or whether the owner had a leak before the project.

03 · From the Job Site

Watch the original project video

At the front of the house, the timber entry gives you a fixed reference for the roof overhang and the gable. The close-ups let you compare this ribbed, face-fastened system with a concealed-fastener roof.

Open the original reel on YouTube

04 · For Your Own Roof

What to ask for in your quote

The homeowner's proposal included both concealed-fastener standing seam and the selected face-fastened system. A useful comparison keeps the rest of the roof constant: ask whether both options include the same deck, membrane, trim, flashing and ventilation scope before judging the panel prices.

  1. Compare the fastening and edge details in the standing-seam and exposed-fastener options.
  2. Separate full synthetic coverage from localized self-adhered membrane.
  3. Include ridge ventilation, gable and rake trim, and change approval for deck damage.

Keep going: Classic exposed-fastener roofing · Compare the work at eaves, gables and ridges · More Tennessee project stories

05 · Common Questions

What homeowners ask about a job like this

What kind of metal roof went on this Readyville home?

The agreement specifies 26-gauge Classic exposed-fastener panels and gasketed screws. The published reel calls the ribbed roof PBR. Ask for the exact manufacturer profile or shop drawing on your own quote.

What changes when you choose exposed fasteners instead of standing seam?

On this exposed-fastener roof, a gasketed screw passes through the face you can see. The standing-seam option in the proposal used concealed clips. Compare the attachment, edge details, service requirements and warranty terms, not just the panel color.

Was ice-and-water membrane specified everywhere?

No. The agreement calls for full synthetic underlayment with self-adhering membrane at selected details. The video is not a complete record of which layer lies under every panel.

What should a quote list for an exposed-fastener roof?

Look for the panel profile and gauge, fastener type, underlayment and membrane, flashing and trim, ventilation, and a written way to handle deck damage discovered during tear-off.

Are the blue layer and the targeted membrane the same scope item?

No. This agreement specifies full synthetic underlayment plus a self-adhering membrane at selected vulnerable details. The visible blue layer shows work below the metal but is not proof of the product or every concealed location.

Does a dark trim line show that the ridge is vented?

Not by itself. The agreement lists a continuous ridge vent. The finished gable image shows the roof's outline but cannot verify the vent construction or air path. Ask for the ventilation detail in the quote.

Why specify gasketed ZAC screws rather than just calling the roof screw-down?

The specified fastener is part of the roof assembly, not just its color. The gasket helps seal the hole where the screw passes through the metal. A still can reveal that attachment type but cannot verify seating or consistency across the roof.

The Metal Roofers · Readyville, Tennessee