Metal Roofing Alliance Member
TVA Preferred Partners Network
10,000+ Metal Roof Jobs
Nashville, TN
Licensed & Insured
BBB A+

From The Metal Roofers’ Job Files · Music Row storefront · Custom metal window-roof accent

How a red standing-seam window roof was rebuilt at TailGate Brewery

At TailGate Brewery's Music Row location in Nashville, The Metal Roofers replaced the small roof above a window with hand-formed, color-matched red 24-gauge metal. The signed scope covered this roof accent, new flashing and the edge terminations. It did not cover a whole-building reroof or correct standing water outside that work area.

Watch the project reelSee the finished roof ↓
Finished red raised seams and light edge trim over the storefront window
Original footage, 00:52.5 · Finished window-roof accent under evening lighting. The photo records the visible profile, not a drainage or water test.

Nashville, TN

TailGate Brewery, Music Row

24-gauge

Specified hand-formed metal

Color-matched red

Architectural standing seam

One window roof

Flashing and edges included

01 · The Finished Roof

A small roof makes a big difference to the storefront

The bright red accent reads as part of the storefront, but its job is more specific than its color. It is a small roof assembly over an opening in the building’s exterior. The published film calls it a cupola. On this project, that means the window-roof accent, not a cupola on the main roof ridge. The agreement defined a narrow work area and called for the crew to plan the work before the business opened. The record does not establish the actual hours worked or say why the customer selected the repair.

The strong red accent is easy to spot above the window. The detail views show why this was more than matching a color: on a small roof, the edges, wall transitions and where the work stops account for much of the job.

The Short Answer

What this job shows

TailGate Brewery's Music Row scope covered the small roof above a window: color-matched red 24-gauge metal, new flashing and edge terminations. It was not a whole-building reroof and explicitly did not include work on standing water outside the accent.

The signed scope and closed job match the small roof above the window. The film documents the finish and fit. Neither the video nor the agreement establishes a water-test result or a correction to existing standing water elsewhere. How we document our work.

02 · The Work, In Order

From the first work to the finished roof

Step 01

Define which roof is being replaced

The written work stops at the roof above the window. That boundary matters on a storefront: the roof surface being replaced, the adjacent wall and any separate drainage condition are not automatically one repair. Standing water outside the window-roof scope was explicitly excluded.

Exposed wood and the existing edge beneath the red window-roof accent
Original footage, 00:12.5 · The opened roof exposes wood and the existing edge. This view does not establish that the wood was replaced.

Step 02

Match the color and form the metal for the opening

The contract specifies hand-formed, color-matched red 24-gauge metal. Gauge refers to the sheet specification; it does not tell you the paint color, coating or warranty terms. The visible goal was to keep the bright red appearance while fitting the new pieces to this small roof. The reviewed record does not identify an exact paint code or manufacturer.

Installer holding a folded red metal piece beside a stone storefront window
Original footage, 00:42.5 · Fitting a formed red piece above the storefront window. This is a work-in-progress view.

Step 03

Fit the standing-seam pieces

The video shows the sequence of working on the existing accent, forming the new sheet metal and fitting the red standing-seam pieces. The raised seams create the lines you see across the finished accent. A close-up of the metal shows the fit at that moment; it is not proof of the fastener schedule or a test of concealed work.

Drill bit aligned beside a raised rib in the red metal window roof accent
Close-up at 0:48. A bit is visible at the formed rib during the installation, not evidence of the attachment pattern for the whole projection.
Driver setting a fastener through a red formed metal edge
Original footage, 00:38.0 · A close-up of fastening at the working edge. It does not establish the fastening specification for the entire accent.

Step 04

Treat the perimeter as part of the roof

New flashing and terminations were included, not left as an assumption. Flashing is the metal at a change in surface; a termination is where the assembly ends. Both are important on a small project because there is proportionately more perimeter to fit than on a broad, uninterrupted roof plane. The signed scope is better evidence of what was included than a finished red panel alone.

Hand forming the red roof trim at the TailGate Brewery window accent edge
Detail work at 0:49. A hand tool grips the formed red edge where the pieces above the window come together.

Step 05

Compare the finished result with the signed work area

The closing views show the red roof accent over the window after installation. The Music Row job is marked closed in AccuLynx. These are distinct facts: the video documents how the accent looks, and the signed scope documents what the business contracted to have replaced. Neither establishes that an excluded drainage condition was repaired.

The storefront has a finished red standing-seam window-roof accent, and the matched Music Row job is closed. The project shows what a focused architectural-metal replacement can include without taking on the main roof. No water test, long-term performance result or correction of the separate standing-water condition is claimed.

03 · From the Job Site

Watch the original project video

The strong red accent is easy to spot above the window. The detail views show why this was more than matching a color: on a small roof, the edges, wall transitions and where the work stops account for much of the job.

Open the original reel on YouTube

04 · For Your Own Roof

What to ask for in your quote

On a storefront accent, the short panel runs are only part of the job. Look at how the assembly ends against the wall and at each edge. A square-foot comparison can miss the fitting, flashing and terminations that the TailGate scope called out explicitly.

  1. Mark the exact storefront roof and adjacent areas excluded from the work.
  2. List sheet gauge, matching process, flashing and edge terminations.
  3. Describe access and working windows, and treat unrelated drainage separately.

Keep going: Custom architectural metal accents · Read how flashing differs from field metal · More Tennessee project stories

05 · Common Questions

What homeowners ask about a job like this

Was the whole roof replaced at TailGate Brewery?

No. This Nashville project was limited to the small red roof above the window. The signed work included hand-formed 24-gauge red metal, new flashing and new terminations in that area only.

What is the difference between a cupola and a window-roof accent?

A traditional cupola sits on a roof ridge or another high point. In the TailGate video, the word refers to the architectural accent above the storefront window. For a proposal, draw or mark the exact roof area instead of relying on the label alone.

Can a small metal roof be replaced while the rest of the building keeps its existing roof?

Sometimes. This case demonstrates a limited replacement over one window. Whether a separate scope works elsewhere depends on how the roof meets the wall, where water drains and whether a problem extends beyond that roof.

Did replacing the window roof correct standing water elsewhere?

No correction outside the work area was included. A separate standing-water problem should be assessed as its own scope, not assumed fixed by replacing a nearby roof accent.

Why might a small storefront roof call for custom metal work?

The new metal must fit the existing opening and the adjacent surfaces. The TailGate agreement specified hand-forming, a color match and new flashing and terminations. Those scope items are more informative than the panel color or the size by itself.

Was before-opening work a documented condition at TailGate?

The written scope called for arranging work before the business opened. The record does not confirm the actual work hours. On another storefront job, confirm access, business hours and protection around the opening in advance.

Does color matching mean the project record gives an exact paint code?

No. The signed scope calls for color matching on red 24-gauge metal, but the reviewed record does not identify an exact coating code. If future matching matters, ask for a sample and written product designation.

The Metal Roofers · Nashville, Tennessee

Have a roof like this?

Tell us what you have in mind. We’ll take a look and explain what should go into the scope for your property.

Request an inspection and quoteSee more project stories →